Home>>Content
second runway, the second terminal and the integrated transportation hub of Shanghai Hongqiao International Airport was finished well before the 2010 Shanghai World Expo. This expansion project was constructed in accordance with the design to transport 40 million visitors and 1 million tons of cargoes, and it mainly included a 4E grade closely spaced parallel runway, which is 3300 meters long and 60 meters wide, in the west side of the already existing runway, a terminal with 25 square meters and some supporting facilities.
The integrated transportation hub of Hongqiao Airport is a collection of express railways, intercity and urban rail transits, public buses and taxis as a modern and large-scale integrated transportation hub. The project was expected to be preliminarily finished at the end of 2009, and was successively put into use during the 2010 Shanghai World Expo. This transportation hub would greatly facilitate the transportation of passengers and cargo in the Yangtze River Delta region, especially for Jiangsu Province and Zhejiang Provinces.
Enquiry hotline: 96990